CTAP RI M and E

Operation and Component M and E Analyzer Views

RI Progress

Introduction
This tool generates a variety of basic statistics for DevTreks standard monitoring and evaluation uris. The analyses include totals, statistics, incremental change, and progress.

Analysis View Description
v202b

Version: 1.7.0

Feedback About carbon/componentgroup/CTAP RI M and E/663/componentmeprogress1

Step 1 of 3. Analyze


Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Aggregate Using:
Display Full View:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. The accompanying tutorial contains a reference that explains these analyzers.
  • Step 1. Base Calculations To Analyze: Make sure that the data being analyzed corresponds to outputs.
  • Step 1. Analysis Type:The Analysis Type that is saved should match the name of this analyzer.

Step 2 and 3

  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze: Make sure that the calculator chosen has been used with the data being analyzed.
  • Step 2. Compare Using: The Compare Only option uses a calculator's Alternative Type property to further "subdivide" the indicator data being analyzed to support the comparative analysis of alternatives.
  • Step 2. Aggregate Using: Types is the least detailed analysis. Groups is the next most detailed analysis. Labels can be the most detailed, but all of the data being analyzed must have been classified using labels and Work Breakdown Structures.
  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.

Reminder: Analyzers require running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
CTAP RI M and E
Component Group : CTAP RI M and E ; A10
Component AllAlt. 0Alt. 1Alt. 2Alt. 3Alt. 4Alt. 5Alt. 6Alt. 7
Name CTAP RI ACTQ2CTAP RI ACTQ4CTAP RI ACTQ6CTAP RI ACTQ8CTAP RI BMQ2CTAP RI BMQ4CTAP RI BMQ6CTAP RI BMQ8
Date 06/30/201612/30/201606/30/201712/30/201706/30/201612/30/201606/30/201712/30/2017
Label Q2Q4Q6Q8Q2Q4Q6Q8
Target Type actualactualactualactualbenchmarkbenchmarkbenchmarkbenchmark
Indicator 1 Awareness TrainingAwareness TrainingAwareness TrainingAwareness TrainingAwareness TrainingAwareness TrainingAwareness TrainingAwareness Training
Observations 11111111
Date 06/30/201612/30/201606/30/201712/30/201706/30/201612/30/201606/30/201712/30/2017
Label OC1OC1OC1OC1OC1OC1OC1OC1
Total Unit most likelymost likelymost likelymost likelymost likelymost likelymost likelymost likely
Total Planned Period 20.00020.00020.00020.00020.00020.00020.00020.000
Total Planned Full 80.0080.0080.0080.0080.0080.0080.0080.00
Total Planned Cumulative 20.0040.0060.0080.0020.0040.0060.0080.00
Total Actual Period 20.0020.000.000.000.000.000.000.00
Total Actual Cumulative 20.0040.0040.0040.000.000.000.000.00
Total Actual Period Progress 0.000.00-20.00-20.000.000.000.000.00
Total Actual Cumul Progress 0.000.00-20.00-40.000.000.000.000.00
Total Plan P Percent 100.00100.000.000.000.000.000.000.00
Total Plan C Percent 100.00100.0066.6750.000.000.000.000.00
Total Plan Full Percent 25.0050.0050.0050.000.000.000.000.00
Q1 Unit lowlowlowlowlowlowlowlow
Q1 Planned Period 10.00010.00010.00010.00010.00010.00010.00010.000
Q1 Planned Full 40.0040.0040.0040.0040.0040.0040.0040.00
Q1 Planned Cumulative 10.0020.0030.0040.0010.0020.0030.0040.00
Q1 Actual Period 10.0010.000.000.000.000.000.000.00
Q1 Actual Cumulative 10.0020.0020.0020.000.000.000.000.00
Q1 Actual Period Progress 0.000.00-10.00-10.000.000.000.000.00
Q1 Actual Cumul Progress 0.000.00-10.00-20.000.000.000.000.00
Q1 Plan P Percent 100.00100.000.000.000.000.000.000.00
Q1 Plan C Percent 100.00100.0066.6750.000.000.000.000.00
Q1 Plan Full Percent 25.0050.0050.0050.000.000.000.000.00
Q2 Unit highhighhighhighhighhighhighhigh
Q2 Planned Period 30.00030.00030.00030.00030.00030.00030.00030.000
Q2 Planned Full 120.00120.00120.00120.00120.00120.00120.00120.00
Q2 Planned Cumulative 30.0060.0090.00120.0030.0060.0090.00120.00
Q2 Actual Period 30.0030.000.000.000.000.000.000.00
Q2 Actual Cumulative 30.0060.0060.0060.000.000.000.000.00
Q2 Actual Period Progress 0.000.00-30.00-30.000.000.000.000.00
Q2 Actual Cumul Progress 0.000.00-30.00-60.000.000.000.000.00
Q2 Plan P Percent 100.00100.000.000.000.000.000.000.00
Q2 Plan C Percent 100.00100.0066.6750.000.000.000.000.00
Q2 Plan Full Percent 25.0050.0050.0050.000.000.000.000.00
Dataset: CTAP RI M and E IRI This data is used in a CTAP tutorial.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.